LIS downtime procedure: what to do before, during and after an outage

Every LIS goes down eventually — a failed PC, a power cut, a dead analyzer interface, ransomware, or an internet outage that takes a cloud system with it. Labs that cope have a written procedure, a box of paper forms and staff who have practised. This guide covers why it matters at inspection, what to do at each stage, and gives you a free template you can adapt and sign.

Reviewed 2026-11-08 against the sources listed at the end. General information for US laboratories, not legal advice.

Why downtime procedures matter at inspection

CLIA does not use the word "downtime", but its rules assume you have one. Your procedure manual must describe your system for entering and reporting patient results, and "the course of action to take if a test system becomes inoperable" (42 CFR 493.1251(b)(13)–(14)). Results must move accurately from data entry — manual or interfaced — to the final report (493.1291(a)), which is exactly what back-entry after an outage puts at risk. If results will be late, you must decide whether to notify the ordering party (493.1291(h)), and paper downtime records must be retained like any other (493.1105).

CAP accreditation checklists add computer-system requirements of their own, and accredited labs commonly cite them for documented downtime and recovery procedures and for keeping procedures accessible when electronic copies are not. Check the current checklist edition for the exact wording. In either survey, the questions are practical: is the procedure written and approved, have staff been trained on it, and can you show that results produced during the last outage were verified when entered afterwards?

Before: be ready on an ordinary day

  • Write the procedure, have the laboratory director approve, sign and date it, and review it at least once a year.
  • Keep a downtime kit at each bench: paper requisitions, a downtime log, a block of pre-numbered accession labels, manual report forms on letterhead, and printed lists of reference intervals, critical values and client contacts.
  • Keep a printed copy of the procedure (and key test procedures) where staff can reach it without a computer.
  • Make backups automatic, keep a copy off-site, and test a restore — an untested backup is a hope, not a plan.
  • Put the LIS PC, network switch and label printer on a UPS.
  • Run a drill — a short, announced exercise on a quiet shift is enough — and record who took part.

During: keep testing, keep it traceable

  1. Declare downtime: one named person decides, records the start time and notifies staff, IT and the LIS vendor.
  2. Register on paper using the pre-numbered downtime accession numbers; label every specimen with two identifiers.
  3. Prioritize STAT and critical work; tell ordering clients if routine results will be late.
  4. Keep every analyzer printout. If only the interface is down, results can be printed from the instrument and entered later.
  5. Issue manual reports only on the approved form, which must still carry every required report element.
  6. Phone critical values immediately and log who was called, when, and the read-back.
  7. Keep running and recording QC on paper, so every patient run can be tied to its QC.

After: recover, back-enter, verify

  1. Confirm the system is sound before use: data intact, correct date and time, interfaces passing results correctly. Restore from the last good backup if needed.
  2. Back-enter every downtime order and result against its downtime accession number.
  3. Have a second person verify each back-entered result against the instrument printout or paper record.
  4. Reconcile the downtime log against what is now in the system — no specimen missing, none entered twice.
  5. If a result already reported on paper differs from what is entered, treat it as a reporting error: notify the ordering party and issue a corrected report, keeping both.
  6. File the paper records, record the end time, and hold a short review: cause, impact, what to change.

How an offline-first LIS changes the risk

For a cloud-only LIS, an internet outage is a full outage: no registration, no results, no reports. An offline-first LIS keeps its database on the lab's own PC, so an internet outage only pauses sync. SamLab™ works this way — registration, billing, result entry and report printing carry on without internet, and sync catches up when the line returns.

That removes the most frequent cause of downtime, not all of them. A failed hard drive, a power cut, ransomware or a broken analyzer interface still stop work, so you still need the procedure, the paper kit and a tested backup. SamLab™ backups run daily by default to a folder you choose and can be copied to a second location as they are made; how they are stored is covered on our security page. Analyzer interfacing is explained on analyzer LIS integration.

Free LIS downtime procedure template

The template is vendor-neutral and free to adapt: fill in your lab's details, contacts and decisions, then have it approved and signed. Open the printable template (print it or save it as a PDF from your browser) or download it as plain text to paste into your own document system.

Related: CLIA test report requirements (what your manual downtime report must still show) and SamLab™ for US laboratories.

Questions labs ask

Does CLIA require an LIS downtime procedure?+

CLIA requires the procedure manual to describe how results are entered and reported and what to do if a test system becomes inoperable (42 CFR 493.1251(b)(13)–(14)), and results must transfer accurately to the final report (493.1291(a)). A written downtime procedure is how labs meet those duties for the LIS.

What should a lab downtime kit contain?+

Paper requisitions, a downtime log, pre-numbered accession labels, manual report forms on letterhead, printed reference intervals and critical values, a client contact list, and a printed copy of the downtime procedure itself.

How do you verify results entered after downtime?+

Back-enter each result against its downtime accession number, then have a second person check every entry against the instrument printout or paper record, and reconcile the downtime log so nothing is missing or duplicated.

Does an offline LIS need a downtime procedure?+

Yes. Offline-first software keeps working through internet outages, but a failed PC, power cut, ransomware or a broken analyzer interface can still stop it, so the paper procedure and tested backups are still needed.

Sources

SamLab™ is an offline-first LIS for small and mid-size labs, with a 7-day free trial and no card. See what it offers US laboratories, in plain terms.

7-day free trial · no card

Try the whole lab, free for 7 days.

No card. No catch. Run SamLab™ on your own data — online or offline — and feel the difference before you pay anything.