======================================================================== LIS DOWNTIME PROCEDURE ======================================================================== Laboratory name: ________________________________________ CLIA number: ________________________________________ Document number / version: ________________________________________ Effective date: ________________________________________ Next review date: ________________________________________ Approved by (Laboratory Director), signature and date: ________________________________________ 1. PURPOSE AND SCOPE -------------------- - This procedure describes how the laboratory continues testing and reporting when the laboratory information system (LIS), its interfaces, or the computers and network it depends on are unavailable, and how the laboratory recovers afterwards. - It applies to all staff who register patients, collect or receive specimens, perform testing, or release results. - References: 42 CFR 493.1251(b)(13)-(14) (procedure manual); 42 CFR 493.1291 (test report); 42 CFR 493.1105 (record retention); the laboratory's accreditation checklist, if accredited. 2. TYPES OF DOWNTIME -------------------- - Planned downtime: scheduled updates or maintenance, announced in advance. - Unplanned downtime: the LIS or its computer is not available without warning. - Partial downtime: the LIS works but a part does not (analyzer interface, label printer, network, internet or cloud sync). - Decide and record here which partial failures trigger this full procedure: ________________________________________ 3. ROLES AND CONTACTS --------------------- Downtime coordinator (declares start and end of downtime) Name: ________________________________________ Phone: ________________________________________ Backup person: ________________________________________ LIS administrator Name: ________________________________________ Phone: ________________________________________ Backup person: ________________________________________ IT support Name: ________________________________________ Phone: ________________________________________ Backup person: ________________________________________ LIS vendor support Name: ________________________________________ Phone: ________________________________________ Backup person: ________________________________________ Analyzer service Name: ________________________________________ Phone: ________________________________________ Backup person: ________________________________________ Clients / ordering providers to notify of delays Name: ________________________________________ Phone: ________________________________________ Backup person: ________________________________________ 4. BEFORE DOWNTIME: PREPAREDNESS -------------------------------- 1. Keep a downtime kit at each workstation: paper requisitions, downtime log, pre-numbered downtime accession labels (range: ________ to ________), manual report forms on letterhead, printed reference intervals, printed critical-value list, client contact list, and a printed copy of this procedure. 2. Check the kit every ____ months and after every use; restock forms and labels. 3. Backups run automatically (schedule: ____________). A copy is kept off-site at: ____________. 4. A test restore of the backup is performed at least every ____ months and recorded. 5. The LIS computer, network equipment and label printer are on a UPS. 6. Staff are trained on this procedure at hire and at least annually; a downtime drill is held every ____ months. 7. For planned downtime, staff and clients are notified at least ____ hours in advance. 5. DURING DOWNTIME ------------------ 1. The downtime coordinator declares downtime, records the start time in the downtime log, and notifies staff, IT and the LIS vendor. 2. Register each patient on a paper requisition and assign the next downtime accession number. Label every specimen with two patient identifiers and the downtime accession number. 3. Prioritize STAT and critical work. If routine results will be delayed beyond the laboratory's time frames, decide by urgency whether to notify the ordering provider, and record the decision (42 CFR 493.1291(h)). 4. Keep every analyzer printout with its downtime accession number. If only the interface is down, print results at the instrument for later entry. 5. Run and record quality control on paper so each patient run can be linked to its QC. 6. Issue manual reports only on the approved downtime report form. Every manual report must show: patient name and ID number; name and address of the testing location; report date; test performed; specimen source when appropriate; result with units or interpretation; condition and disposition of any unacceptable specimen; and reference intervals (42 CFR 493.1291(c)-(d)). 7. Phone critical values immediately and record the result, person notified, date and time, and read-back in the critical-value log. 8. Do not reuse a downtime accession number. Void spoiled numbers in the log. 6. RECOVERY AND BACK-ENTRY -------------------------- 1. Before use, confirm the LIS is sound: data intact, date and time correct, interfaces transmitting correctly. If needed, restore from the last good backup and record which backup was used. 2. The downtime coordinator records the end time of downtime. 3. Back-enter every downtime order and result into the LIS against its downtime accession number. 4. A second person verifies every back-entered result against the instrument printout or paper record and initials the back-entry verification log. 5. Reconcile the downtime log against the LIS: every downtime accession is accounted for, none is entered twice. 6. If a result already reported on paper differs from what is entered, treat it as a reporting error: notify the ordering provider promptly, issue a corrected report, and keep the original and corrected reports (42 CFR 493.1291(k)). 7. File all paper records from the downtime. Retain them for at least 2 years, or longer where required (42 CFR 493.1105). 8. Within ____ working days, review the event: cause, duration, impact, and changes to this procedure. 7. DOWNTIME LOG --------------- Start (date/time) | End (date/time) | Type / cause | Declared by | Accession range used | Back-entry done by | Verified by ______ | ______ | ______ | ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ | ______ | ______ | ______ 8. BACK-ENTRY VERIFICATION LOG ------------------------------ Downtime accession # | Patient ID | Test | Entered by | Verified by | Discrepancy? (Y/N, action) ______ | ______ | ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ | ______ | ______ 9. TRAINING AND REVIEW SIGN-OFF ------------------------------- Name | Role | Date trained / reviewed | Signature ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ ______ | ______ | ______ | ______ ======================================================================== Free template from SamLab™ (samlablis.com). Adapt it to your laboratory; it is not legal or regulatory advice. Guide: https://samlablis.com/lis-downtime-procedure Reviewed: 2026-11-08